|
|
|
Part 1 Part 2 Part 3 Part 4 (this page) ![]() DB locomotive 66105 stands at the head of train 6N13 at Claygate station on 13th June 2009. Preparations are underway to begin unloading the new concrete sleepers. 13th June 2009. ![]() A Hydrex machine unloads concrete sleepers from train 6N13. ![]() Another view of the Hydrex machine unloading new sleepers from train 6N13. By this time ballast train 6N12 has moved forward to be unloaded and is no longer in the picture. 13th June 2009.
|
|