|
|
|
|
|
Part 1 | Part 2 (this page) Coxes Lock | Shed By Canal | Coxes Mill | Hamm Moor
The barge "Nautilass" has entered Weybridge Town Lock from the River Wey. 22nd September 2009.
This lock in the process of being filled with water, ready for "Nautilass" to continue her journey. 22nd September 2009.
The lock has been filled and the waters have returned to being calm again. The barge crew can now open this set of gate and proceed along the canal.. 22nd September 2009.
The "Nautilass" slowly leaves the lock. 22nd September 2009.
The overflow channel that is at the Woking end of the lock. 30th January 2009.
|
|
|