Railway  Engineering  Work
 
 Claygate  13th  June  2009 - Part 4


Part 1    Part 2    Part 3    Part 4 (this page)
 
 

DB locomotive 66105 stands at the head of train 6N13 at Claygate station on 13th June 2009.  Preparations are underway to begin unloading the new concrete sleepers. 13th June 2009.
   
 

A Hydrex machine unloads concrete sleepers from train 6N13. 
 
 

Another view of the Hydrex machine unloading new sleepers from train 6N13.  By this time ballast train 6N12 has moved forward to be unloaded and is no longer in the picture.  13th June 2009.
   
         
  You may be interested in these railway books: On Track Railway DVD and Book Catalogue    
The Highland Railway
Guildford to Redhill
Industrial Railways of the South East
         

 

66105 has moved its train forward as the work of unloading sleepers continues. 
 
 

Tamping machine number 73928 at work on the newly laid track.  13th June 2009.
 
 

A second view of tamping machine number 73928.
 

         
  You may be interested in these railway DVDs: On Track Railway DVD and Book Catalogue    
Southern India
Extreme Steam
25 Years of Southern Electrics
         

 
 

The tamping machine approaches a position where the unloading of ballast is till continuing.
 
 

A photograph of the newly laid track as the light fails at dusk. 13th June 2009.
 
Part 1    Part 2    Part 3    Part 4 (this page)
    

     
  - This page sponsored by -
 Saxon Court Books - On Track Catalogue - for railway DVDs and books
 
     
 


- please report broken links to railalbum@parthenon.uk.com -

©  Parthenon Consultancy Limited 2009